Order Helpline 01752 692 294
Order Helpline 01752 692 294

Nuie 1600mm White Left Handed Square Shower Bath

Code:
WBS1685L
Brand:

Nuie's Left-Handed Square Shower Bath is a perfect space-saving option for your bathroom, showcasing a stylish and modern square design. It combines a standard bathtub with a shower unit to create a single bathroom feature, with additional space at one end of the bathtub allow... Read More

£349.35 Incl. VAT
Earn points

SUPER Rewards Earn points and build more across our SUPERSTORES!

Find out more
Oops! Please select from the options
Est. Delivery: 3-5 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Friday, Dec 19th - order in:
days hrs mins secs
View Transport Policy

Next day delivery is subject to stock availability. If products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

Description

Nuie's Left-Handed Square Shower Bath is a perfect space-saving option for your bathroom, showcasing a stylish and modern square design. It combines a standard bathtub with a shower unit to create a single bathroom feature, with additional space at one end of the bathtub allowing you to shower in comfort. Why not install a bath screen to create a watertight shower enclosure?

This undrilled tub is manufactured from sanitary grade acrylic, making it durable, long-lasting, highly hygienic, and easy to clean. It also comes supplied with a leg set for ease of installation, saving you time and hassle.

Features & Benefits: Nuie 1600mm White Left Handed Square Shower Bath

  • Bathtub is undrilled and manufactured from sanitary grade acrylic
  • Comes with a leg set ensuring easy installation, saving time and hassle
  • Fully compatible with bath screens and comes with a 5-year guarantee

Whether you wish to add a decorative feature to your bathtub or something more in keeping with its white minimalist style, you can choose from a wide range of bath panels (sold separately) to complement your bathroom design.

Please note:

  • Bath panels are sold separately
  • During installation, you must take extra care to avoid damaging the fittings. The manufacturer provides a 5-year guarantee against faulty workmanship or materials (excluding serviceable parts), providing they have been installed, cared for, and used according to the instructions.

Dimensions

Depth
390mm
Size
1600mm x 850mm
Width
1600mm

Details

Material
Acrylic
Colour
White
Finish
Gloss
Tap Holes
Undrilled
Shape
Square
Bath Type
Single Ended
Left Or Right Handed
Left Handed

Downloads

There are no product downloads to show.

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Nuie 1600mm White Left Handed Square Shower Bath